High rise window replacement undertaken my Gecko Rope Access

How Do You Replace a Window in a High Rise Building?

Modern commercial glazing is engineered to last decades, but it still needs regular inspections, maintenance, and in some cases, repair or replacement. While this process might be relatively straightforward in single storey properties, high-rise buildings pose significant challenges due to accessibility, height and safety requirements. In these cases, specialised access equipment and trained facade maintenance professionals are often required to safely inspect and service glazing systems.

That’s where we come in!

High rise window replacement undertaken my Gecko Rope Access

Our highly skilled rope access technicians are trained specifically in building works and specialise in everything from glazing inspections and sealant repairs to full-scale high rise window replacement, in conjunction with a glazier company, all without the need for costly and cumbersome scaffolding or heavy machinery. Not only does our rope access rigging system allow us to set up and pack down more quickly, and access hard-to-reach areas, it allows us to carry out works with little to no day-to-day disruption to residents, staff and the public.

Here’s how the process works:

Identify the Source of the Issue

The process typically starts with a detailed inspection of the building facade to identify issues such as cracked glass, failed seals, water ingress, corrosion or structural movement. This is crucial because an issue that appears to be a localised problem, such a leaking window seal in one apartment or office, can sometimes be a symptom of a broader facade or sealing system failure with the potential to affect multiple levels of the building.

Once the inspection is complete, our maintenance team will assess whether the glazing requires cleaning, resealing, repair or full replacement.

Assess Access and Safety Considerations

Before any maintenance or repair work begins, our team will carefully assess how to access the affected area. Factors such as building height, facade design, proximity to public areas and weather conditions must all be considered to ensure work is carried out safely.

Safety planning can include scheduling works outside peak hours, establishing exclusion zones at ground level and coordinating with building management to minimise disruption to tenants and the public, whilst ensuring compliance with workplace health and safety requirements.

Develop a Plan

With access and safety requirements taken care of, the next step for our team is to develop a detailed works plan that outlines the scope of work, prioritises any urgent defects, outlines the schedule of work and identifies what equipment and materials will be needed to complete it safely and on time.

Perform the Glazing Work

Once planning is complete, the required maintenance, repairs or replacements are carried out whilst following strict safety protocols. After this, a final inspection is conducted to ensure that all repairs meet required standards.

Contact Gecko today to discuss our full range of glazing services

“Our team are really impressed with Gecko Rope Services and our Committees have provided great feedback too. We highly recommend their services, which are highly professional and value for money.”

Carly Frawley, Archers Strata Professionals, Sunshine Coast

“It has been a pleasure to do business with Gecko. The Jetty Apartments are near the coastline and constantly exposed to sea spray. After trying many companies, we have found the quality of work done by Gecko is suprioer to any other contractor we’ve used. They are a professional company. The offer competitive pricing, quality workmanship, reliability and are willing to address any concerns,”

Paul, The Jetty Apartments Body Corporate

“Gecko quoted on the building and window wash down for an odd-shaped building. A couple of others didn’t want to quote but it was no problem for Gecko. Promptly quoted and worked with the committee to get it all sorted, easy to deal with.”

Sianne Corney, Archers Strata Professionals

“Thanks very much for the team members that worked on the QCE C3 Roller change. I found them very precise and conscientious with their approach. It was a pleasure to be a part of the work environment.”

Darren Jackson, Mechanical Site Coordinator, Fenner, Murarrie

“Both Ramy and Breno did a very good job at our retirement village. They’re friendly, well mannered, organised and obliging. We received some good feedback from our residents as well”

Amol Maheshwari, Retirement Living Manager, Church Of Christ Retirement Village, Mitchelton, Brisbane.

"Gecko Rope Access has to be one of the most safe conscious and professional rope access crews and subcontractors I have had the pleasure to work with."

Samuel Hughes, Freyssinet Australia, Engineer on RBWH Block 8 Make Safe project

"Their thorough professionalism, great understanding and communication, experience background and across all the required safety protocols, Highly recommend for any rope access projects."

Alan Briers, Albert Smith Signs